A
aaelectric
Where it says operational limations, what would go in there. Also if the circuit is using the conduit as earthing system what would you put in cpc colum on size of cable?
Would you code no earth tags at switches or sockets if it was not presant and using conduit as earth?
Would you code no earth tags at switches or sockets if it was not presant and using conduit as earth?