As i don't really do much proper conduit work, i have what may be an obvious question to some. Within a PVC installation, if you had 2 phases feeding a light switch for 2 lots of lighting, would there be a cpc pulled in with both the feeds, or is it done with just the cpc from one circuit at the switch?