I have just made up a temp builders supply with a two way consumer unit with 30ma RCD and two 32 amp breakers. How should i properly wire this into my existing supply. There are no live terminal blocks to screw into on the old consumer unit. I could wire into the red block on the right however I would need to put a further MCB in. Would this be suitable.? Also would 2.5mm cable in a ring be sufficient to connect from the old to new temporary consumer? I woundnt imagine the temporary loads are going to be great just for temp lighting and power tools etc.