I
iceman
hello fellas iv just been asked to install a four way c/u and tails , bonding to gas and water install 6 downlights, two twin sockets, move light switch 1.5mm 2.5mm cables 10mm bong 25mm tails 16mm earth supply downlights all in parts and labour ÂŁ495 wots ya thoughts?