Does the consumer units top knockouts need to have stuffing glands installed even if a 50x50 trunking will cover the holes? Or is it sufficient to use a grommet or grommet strip if a rectangular hole is cut?
The stuffing gland will maintain the IP rating but that will be maintained by the trunking cover whilst it’s on.
What do you guys do with the knockouts when trunking is running along the top, bottom and sides?
The stuffing gland will maintain the IP rating but that will be maintained by the trunking cover whilst it’s on.
What do you guys do with the knockouts when trunking is running along the top, bottom and sides?