I've always thought it was ok to get your pfc when getting the Ze. I never been flagged up by NIC for doing it this way etc before. However, I've now been told I should perform Ze seperately and the PFC separately as all the earths need to be connected.
It makes sense as it should be a lower resistance value and so higher PFC when earths connected, But i've never seen anyone else do it like this.
Is it common practice?
It makes sense as it should be a lower resistance value and so higher PFC when earths connected, But i've never seen anyone else do it like this.
Is it common practice?