Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss Critical Feedback recent Consumer unit install Please. in the UK Electrical Forum area at ElectriciansForums.net
I learnt a new word .Crenellated grommet strip, dang it!!
Board is being boxed in and have used some 2 by 1 to bring the board more forwardHello MrShine94
From my perspective and at first glance the terminations other than the Live of the bottom 16A Rcbo ,they look very neat
Is the board spaced out from the Plyboard ? the cables seem to have been squashed between the unit and the Ply
No they have not been shortened just tucked behindHave those fly leads been shortened?
Yes I could do with some of that current grommet strip is rubbish having to tape it onCrenellated grommet strip, dang it!!
everything is being boxed inCould be significantly improved by it not being made by Proteus.
How are the cables managed outside of the board ? Looks like they are just draped across the wall.
That was a previous board from same siteHavnt we seen this photo before?
Reply to Critical Feedback recent Consumer unit install Please. in the UK Electrical Forum area at ElectriciansForums.net