H
highspark
I've got two CU's to quote for. Just got back from one. Absolutely no bonding to water or gas. First floor covered in laminated flooring. Kitchen all tiled and concrete floor.. No access to floorboards unless ripping laminate up. Told customer can't do anything unless I bond gas and water. Customer says I've had a cheaper quote and the other electrician never mentioned gas and water bonding. I said if he hasn't mentioned it hes either not a qualified electrician or hes going to install the CU and not abide by the regs. I left it with them. Its one of them where the cowboys win again. My quote was under 300.