A customer we did 2 jobs for has knocked 500 quid off my last bill because he had to patch a ceiling, after he'd plastered it then decided he wanted spot lights in there. He knocked the money off the bill for the second job, the first job was paid for in full even though all the work had been done.
Hes also billed us for repainting said room even though it wasn't painted while i was there.
The bill for the second job was alot bigger than planned as he added around 500 quids worth of extras, which hes obviously taken off.
He never mentioned a thing until the post arrived.... Where do i stand on this? ÂŁ500 is obviously alot of money, and thats a fair chunk out of our profit!
Hes also billed us for repainting said room even though it wasn't painted while i was there.
The bill for the second job was alot bigger than planned as he added around 500 quids worth of extras, which hes obviously taken off.
He never mentioned a thing until the post arrived.... Where do i stand on this? ÂŁ500 is obviously alot of money, and thats a fair chunk out of our profit!