The job was to install
1. a 400v tpn 8 way db (construction site enviroment)
2. feeding a TX
3. which in turn feeds a 110 v lighting circuit that is not on a plug into the front of the TX, but instead hard wired into a double pole outgoing MCB of the same TX so as to avoid unwanted disconnection of the lights.

1. where/how would i record the cct details/results for the lighting cct being fed from the TX?
2. how do i verify that the recorded results for the 110v cct are within limits for tripping times?
 
You can class the TX as a db and the lighting circuit as a sub circuit.

If your EFLI tester will test at 55v to earth (most Meggers do) then just treat it as a normal reduced low voltage circuit.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
west brom

Thread Information

Title
DB to TX to 110V hardwired circuit.
Prefix
N/A
Forum
Periodic Inspection Reporting & Certification
Start date
Last reply date
Replies
1

Advert

Thread statistics

Created
silver surfer,
Last reply from
IQ Electrical,
Replies
1
Views
2,016

Advert

Back
Top