Ive been asked to do some jobs next week, they want the inverters placed adjacent the cu, is this quite common practice? i thought they would go in the loft space?
I assume to reduce the volt drop.
Am i ok to pass the dc down through ceiling in pvc conduit?
also one job is 16 panels 1 string, the other 12 panels 2 strings, why would they want to split it into 2? Just wondered for my own knowledge really.