zap
-
Scenario: PME supply. House converted into flats. Main distribution board splits into five sub boards, one for each flat. Each flat has its own meter and CCU fed by twin and earth. The water pipes in each flat are bonded. (Water pipes are jointed by threaded horse-hair joints). There are no gas services.
Question: Can I or how do I obtain Ze at a flat's CCU assuming main services are bonded at the main distribution board (i.e. parallel paths).
Question: Can I or how do I obtain Ze at a flat's CCU assuming main services are bonded at the main distribution board (i.e. parallel paths).