Have just ran a new 6mm SWA cable 230v single phase supplying an iverter ACU from a 4th floor dis board to the roof. I am unable to isolate the dis board as it servers computer room power racks so i cannot do a Ze test as i cannot disconect the main earth. Also how do i carry out a ZS at the board i no i need the power on to carry out a Zs/PFC at the dis board but i cannot turn off any outgoing MCBs to other ccts
should i just carry out the ZS/PFC at the board with MCBs to other ccts on. i know i have to carry out ZS at points on my installation. But i think on the schedule of test results it asks for Ze ZS and PFC at the orgin.
They have also used a 24way merlin gerin 3phase board but only taken a single phase supply from the rising busbar what came as abit of a shock when looking at the board as the main switch is a 4pole 125A. but all MCBs on all phase have power but on the switch there only using L1 and there also switching the neutral
Any thoughts please. Nothing has goner right on this job glad when its done should be monday will try and upload some photos
Thanks
James Sutton
Have just ran a new 6mm SWA cable 230v single phase supplying an iverter ACU from a 4th floor dis board to the roof. I am unable to isolate the dis board as it servers computer room power racks so i cannot do a Ze test as i cannot disconect the main earth. Also how do i carry out a ZS at the board i no i need the power on to carry out a Zs/PFC at the dis board but i cannot turn off any outgoing MCBs to other ccts
should i just carry out the ZS/PFC at the board with MCBs to other ccts on. i know i have to carry out ZS at points on my installation. But i think on the schedule of test results it asks for Ze ZS and PFC at the orgin.
They have also used a 24way merlin gerin 3phase board but only taken a single phase supply from the rising busbar what came as abit of a shock when looking at the board as the main switch is a 4pole 125A. but all MCBs on all phase have power but on the switch there only using L1 and there also switching the neutral
Any thoughts please. Nothing has goner right on this job glad when its done should be monday will try and upload some photos
Thanks
James Sutton