L

llywelyn111

Do many of you come across new install distribution boards which don't have any RCD testing labels, last test and next test labels that come with every board you buy, or circuit labels? I've come across loads lately and it bugs me like mad.
 
But how can anyone be that lazy not to place a few labels on a board. I knew the bloke who did the work at one of the houses, I asked him why he didn't put the RCD or Last test next test label on. His response, "I didn't test the house so it's not my problem"

Where do you even start with that one
 
Ive come a cross that alot lately, it's so annoying. It just shows that some 'tradesmen' have no intention of returning previous jobs, its as if they know there work is a bag of b*lls so they wont get asked back anyway
 
I have had a few customers recently who do not want stickers all over the front of their shiney new ÂŁ400 fuseboard.

When they are on full view on the kitchen wall or above the front door I can understand their point!!!

I put this on the certificate as a demand by the customer.

I have bought some smart matching stickers, all in silver, at least they are now all the same size and colour!!!
 
Last edited:
A classic I came across was a 36 way TP-N red spot board. The genius that installed it up labelled every fuse way by putting the labels on the fuse carriers. If he’d put a reference to the way it was in it wouldn’t have been so bad.

We had some work done and so 24 fuses had been pulled and just chucked in the bottom of the board. I got called to restore power, how long does it take to replace 24 fuses? It took me 4 bloody hours to sort out what was what!
 
Came across a 3P board in a school in Sunderland once with nothing labeled, school was in so options for de energising circuit by circuit to see what was what were limited we ended up having a very leisurely morning followed by a frantic lunchtime and all in all the job took 3 times longer than it should have
 
Came across a 3P board in a school in Sunderland once with nothing labeled, school was in so options for de energising circuit by circuit to see what was what were limited we ended up having a very leisurely morning followed by a frantic lunchtime and all in all the job took 3 times longer than it should have

They have electricity in Sunderland now ??!!!

They'll be getting flushing netties next !!! :lol:
 

Reply to Distribution Board Lables in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
265
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
756
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
745

Similar threads

  • Question
What I find a little bit interesting is that there was an era of MFT's e.g. Robin, early Kewtech that tried to do non-trip loop tests using D-Lok...
Replies
5
Views
1K
  • Solved
There is an article about that here: https://www.cement.org/learn/concrete-technology/durability/corrosion-of-embedded-materials It states...
2
Replies
27
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top