distribution board | Page 3 | on ElectriciansForums

Discuss distribution board in the UK Electrical Forum area at ElectriciansForums.net

Joined
May 21, 2013
Messages
49
Reaction score
22
Hi

I was wondering if anybody has come across black stub slv? My mums church consumer unit is a nightmare. All of the connections are black stub slv, with half on them not marked as live. Thats ok for the ones that were already connected in the board. But in the board were some wires just connected loose in connector blocks! None of the circuits have an earth either. The main earth bond is there, i have just never come across a board that does not have a seperate earth with each circuit.
 
Pyro is not for the uninitiated or the faint of heart Sonia. That said, you have an opportunity to gain a very worthwhile skill that will never leave you. You'll get rusty at it but it's like riding a bike, you never forget it.
Once you get used to it you'll learn to love the stuff. I, and most of the other dinosaurs on here, do. Watch, learn and soak it up. And see if you can get your hands on some scrap ends to practice on (NB the tools needed can be expensive)
the tools can be picked up for a reasonable price on ebay

the brands to look for with reguards to tooling are;
pyrotenax
bicc

joistripper is handy for the smaller stuff but a rotary stripper is needed for the bigger stuff (or snips and driver)

dont be tempted to snip itit either as you will struggle to screw the pot on
 
just to add for future readers, it is not worth the trouble moving some boards, your better ripping the guts out and using them as a joint box.

hopefully the micc is terminated into couplers first or trunking and not direct into the board or you will find it tricky.


the odd micc would be fine if your inexperienced but it can be a right pig for a lot of cables, damage one and you will have to shorten them all to get them in the board

What utter rollocks!
If you can't do the job without turning the old board into a joint box then walk away and let someone who will do the job properly do it.

And damaging one doesn't necessarily require the whole lot to be re-terminated, there could be any number of ways of getting over that.
 
What utter rollocks!
If you can't do the job without turning the old board into a joint box then walk away and let someone who will do the job properly do it.

And damaging one doesn't necessarily require the whole lot to be re-terminated, there could be any number of ways of getting over that.
i said some not all and im not just counting small db's here im including panels as well, we have had panels with 20+ micc (bare copper no shroud either) directly into the top of the panel all in a tight formation down a wall.
 
Oh my golly gosh, 20+ bare pyro's! Whaddaya want, a medal or something?

Take the gland plate from the old board and use it as a template for the new one. Then when you're finished give the cables a quick clean and polish and they'll look as good as new.

There are places out there with far more than 20 Pyro's installed into boards. If I get a chance soon I get some pictures of some theatre installs where there are at least 96 circuits wired in the stuff coming out of patch panels.
 
Oh my golly gosh, 20+ bare pyro's! Whaddaya want, a medal or something?

Take the gland plate from the old board and use it as a template for the new one. Then when you're finished give the cables a quick clean and polish and they'll look as good as new.

There are places out there with far more than 20 Pyro's installed into boards. If I get a chance soon I get some pictures of some theatre installs where there are at least 96 circuits wired in the stuff coming out of patch panels.
i said+ i didnt count and not all panels have glandplates either
 
So cut the top bit off with the holes in it and use that as the template

My point is that it doesn't matter how many there are in there, the job should be done properly and not bodged with turning old DBs into unnecessary joint boxes.
 
i said some not all and im not just counting small db's here im including panels as well, we have had panels with 20+ micc (bare copper no shroud either) directly into the top of the panel all in a tight formation down a wall.
The op is talking about a rewirable board in a church hall it probably an eight way or such like.
even your panel with 20micc cables should be (or was) standard work for an electrician in my book.
an experienced hand should manage this task no bother as it's not a fusion reactor we are talking about
 
The problem the OP will need to get a well seasoned person in who has plenty of experience with both MICC and old installs, the MICC is very durable and can be expected to last a century even with a few bashes but the issue is is how good the pots were made off originally, disturbing rested pots can cause all manor of issues and its even worse in old listed buildings as its likely to be imperial - I've had to rescue many a failed attempt at upgrading DB's with MICC's as part of the install and I heard they are introducing it back in in teaching... it disappeared with from colleges with the introduction of FP cables and as part of the dumming down to ensure high pass rates for political gain but thats another thread altogether.

Most of the new generation of 'Electricians'! no longer have the skill set that were essential and a requirement only 2 decades ago... hence it is so diluted now you can be called one after 5 weeks!
 
Last edited by a moderator:
I hope this other electrician has a decent experience of MICC, especially if any of the terminations needs re-terminating for any reason, as the chances are that from your description these will be the older imperial sized MICC cables....

EDIT....Must of had the same thoughts at the same time as darkwood!! lol!
 
Last edited by a moderator:

Reply to distribution board in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
376
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
944
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
much more information required. Is the supply to the first building a DNO supply or a sub main cable from another building ? if it is a sub main...
Replies
5
Views
957
  • Question
O.P. Pulled the circuit board out to track the wiring. 1- red goes to pump active 2- red goes to first pin of circuit board 3- empty 4- black goes...
Replies
1
Views
468

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top