B
Bradzz
Hi could anyone tell me if im on the correct section im working out the demand of an installation i have inspected and tested, and im in the middle of completing the paper work, on a ipod and its asked me for the demand of the installation, the installation has 6 panel heaters, protective device is by means of a 16A MCB,for each heater, its a small community hall, im looking on page 111 osg would section 2 be the correct part, as the heaters are not storage heaters.
also the hall has 2 toilets with hand wash water heaters split over 2 rings, how would i apply diversity to these?
One other thing the softwear is asking for maximum demand load and maximum demand units?
cheers people.
also the hall has 2 toilets with hand wash water heaters split over 2 rings, how would i apply diversity to these?
One other thing the softwear is asking for maximum demand load and maximum demand units?
cheers people.
Last edited by a moderator: