Objective: allow fast charging of EV (22 KW)
DNO cutout has 3 100A fuses, but all 3 turned out to be on the same single phase
How to still obtain 22 kW for fast charging of EVs?
Rotary phase converter? Switched on only when needed?
Other approaches?
DNO cutout has 3 100A fuses, but all 3 turned out to be on the same single phase
How to still obtain 22 kW for fast charging of EVs?
Rotary phase converter? Switched on only when needed?
Other approaches?