I have a three story house to wire, with the following floor areas:
Lower ground: 144 square meters
Basement: 157 square meters
Upper floor: 94 square meters
Apart from lighting circuits and cctv, electronic gates, kitchen circuit which is of course additional
I would find the boards existing supply of 20 KVA single phase, not up for the job and would consider a three phase supply requirement, given the 17th edition regs.
Anybody else agree with this ?
I have a three story house to wire, with the following floor areas:
Lower ground: 144 square meters
Basement: 157 square meters
Upper floor: 94 square meters
Apart from lighting circuits and cctv, electronic gates, kitchen circuit which is of course additional
I would find the boards existing supply of 20 KVA single phase, not up for the job and would consider a three phase supply requirement, given the 17th edition regs.