B
bumcrack
This is on the back of my other thread about earthing a ground based array frame....or not according to dti earthing tree.
The problem I have is that the inverter is frame mounted, earthing this down from the house will bring the PME out of the house to the frame.
Also, metering is remote to the house, and the main house CU is nigh on impossible to get cable to. The only point of entry is a sub board in the loft.
a sketch of the existing and proposed is attached, any comments gratefully recieved!
cheers!
The problem I have is that the inverter is frame mounted, earthing this down from the house will bring the PME out of the house to the frame.
Also, metering is remote to the house, and the main house CU is nigh on impossible to get cable to. The only point of entry is a sub board in the loft.
a sketch of the existing and proposed is attached, any comments gratefully recieved!
cheers!