Just thought Id share with you my lovely 1st day of a second fix renovation im doing
at the end of the 1st fix plasterers came in to wiegh up, old guy and I think his son, old guy was ok but the lad ( about 25 ) came in swinging his **** saying those cables had better be in the boxes otherwise ill be snipping them
told him hed better not cut any of them as they were marked and i needed all the length to make off ( about 4 inches )
told the builder 3 times before i left to make sure all cables were brought through and none were cut
returned this morning and discovered every cable at every box had been snipped leaving me the grand total of 2.5 inches sticking out the wall to make off, including all the switches which now have no markings on them, these are not just live and switchwire, there are some switches with 3 mains and 3 switch wires ( 3 gang dimmer. ) a 2 gang, both switches are 2 ways and various others now with no markings on
various cables damaged down to the copper where they have stuffed them in the metal boxes and ripping inner and outer insulation and are unusable
most of cables in bathrooms havnt been brought through so tiler has tiled complete walls where sunk in shaver points and fans are meant to be
I went bazerk at the builder this morning , the plasterers then rang me accusing me saying it was my fault and i should have put the cables in the boxes
told him ( or shouted ) that they werent his cables to touch let alone snip too short, this ended in me hanging up on him
we have a guns at dawn meeting tomorrow, and after the builders go ahead today Ive smashed the **** out of his nicely skimmed kitchen walls whilst having to rewire the cables that were too short as tiled floors above,
the builder has accepted it is their fault and is charging them for my time
what a bunch of absolute *****
I hate plasterers
at the end of the 1st fix plasterers came in to wiegh up, old guy and I think his son, old guy was ok but the lad ( about 25 ) came in swinging his **** saying those cables had better be in the boxes otherwise ill be snipping them
told him hed better not cut any of them as they were marked and i needed all the length to make off ( about 4 inches )
told the builder 3 times before i left to make sure all cables were brought through and none were cut
returned this morning and discovered every cable at every box had been snipped leaving me the grand total of 2.5 inches sticking out the wall to make off, including all the switches which now have no markings on them, these are not just live and switchwire, there are some switches with 3 mains and 3 switch wires ( 3 gang dimmer. ) a 2 gang, both switches are 2 ways and various others now with no markings on
various cables damaged down to the copper where they have stuffed them in the metal boxes and ripping inner and outer insulation and are unusable
most of cables in bathrooms havnt been brought through so tiler has tiled complete walls where sunk in shaver points and fans are meant to be
I went bazerk at the builder this morning , the plasterers then rang me accusing me saying it was my fault and i should have put the cables in the boxes
told him ( or shouted ) that they werent his cables to touch let alone snip too short, this ended in me hanging up on him
we have a guns at dawn meeting tomorrow, and after the builders go ahead today Ive smashed the **** out of his nicely skimmed kitchen walls whilst having to rewire the cables that were too short as tiled floors above,
the builder has accepted it is their fault and is charging them for my time
what a bunch of absolute *****
I hate plasterers