T
TimW
I have discovered that my incoming gas and water pipes are not bonded to the CU.
The gas and water pipes are situated near to one another, but some distance from the CU.
Is it acceptable to bond the water pipe to the gas pipe and run a single bonding cable back to the CU? Or must I run two separate bonding cables, one from each pipe, back to the CU?
The gas and water pipes are situated near to one another, but some distance from the CU.
Is it acceptable to bond the water pipe to the gas pipe and run a single bonding cable back to the CU? Or must I run two separate bonding cables, one from each pipe, back to the CU?