R
rattlehead85
I have been asked to price for a small contract to carry out necessary electrical alterations for kitchen refits which mostly will only involve the use of a minor works cert. I am fully aware that the earthing and bonding needs to be verified for suitability before altering or adding circuitry within the kitchen as well as confirming the main supply adequacy. My question is Will i need to also confirm the bonding arrangements/ protective measures within the bathroom or will this not be necessary as it falls outside the scope of the works i have been asked to carry out?