Hi, i would like to make sure i understand this properly.
On a TNS supply, using 3 core SWA to run a sub-main, and using the third core for CPC, where the SWA gland terminates into a plastic enclosure, how is it best to earth the armour?
Am i right that you run a fly lead (the same size CSA as the live conductors) from the banjo/piranha nut, back to the MET?
Or do you run a bonding conductor from the banjo/piranha nut, to the earth terminal inside the enclosure the gland is terminating into?
Or can you do either
Thanks
On a TNS supply, using 3 core SWA to run a sub-main, and using the third core for CPC, where the SWA gland terminates into a plastic enclosure, how is it best to earth the armour?
Am i right that you run a fly lead (the same size CSA as the live conductors) from the banjo/piranha nut, back to the MET?
Or do you run a bonding conductor from the banjo/piranha nut, to the earth terminal inside the enclosure the gland is terminating into?
Or can you do either
Thanks