Hi,
Been to a property and did some preliminary check on CU; Ze=32.8 ohms, PFC=7 A (not KA) and PSC 1.3 KA and yet there was a Periodic Label (with NICEIC logo on) stuck on the CU cover that said, “next inspection is due on 10/07/2012” and apparently the report was for a year.
Did the chap who did that PIR, ever take his meter out and check anything at all? Easy money, I guess!
Been to a property and did some preliminary check on CU; Ze=32.8 ohms, PFC=7 A (not KA) and PSC 1.3 KA and yet there was a Periodic Label (with NICEIC logo on) stuck on the CU cover that said, “next inspection is due on 10/07/2012” and apparently the report was for a year.
Did the chap who did that PIR, ever take his meter out and check anything at all? Easy money, I guess!