B
Bazultra
Hi ive just started to test installs on a regular basis again and am not 100% sure when to enter EEBADS or ADS in the protective measure(s) box. Also would the ADS time be different depending on the earthing arrangement TNCS,TNS or TT etc?
Thanks Baz
Thanks Baz