Hi All
I need help with completing EIC. The section i cant quite grasp is where for asks for particulars of installation referred to in certificate. I am installing 2 new radial circuits but not sure what to fill in on form. Im working on a large job where the origin is fed from a 3000A ACB that suppies a LV panel, that panel then supplies numerous DB's. The DB my circuits are connected to is way downstream. Do i put details on the DB im connected to or at main LV panel. Hope i have explained correctly. Thanks
I need help with completing EIC. The section i cant quite grasp is where for asks for particulars of installation referred to in certificate. I am installing 2 new radial circuits but not sure what to fill in on form. Im working on a large job where the origin is fed from a 3000A ACB that suppies a LV panel, that panel then supplies numerous DB's. The DB my circuits are connected to is way downstream. Do i put details on the DB im connected to or at main LV panel. Hope i have explained correctly. Thanks