Hi guys, i did an eicr today in a house, theres a few things needing attention but the main one is that whoever fitted the majority of the lights has not connected the earths and has cut it back too far to allow connection, what do i mark this down as c1, c2 or c3. I dare say the client is not going to go for any repair as the majority of cables have been plastered in and some of yhe ceilings lowered with no access to the main lighting connection. Any advice welcomed.