Hi all,
unvented electric 3kw cylinder to be fitted to property alongside electric water heater for radiators. The water heater has terminals for supply and control wiring, the cylinder does not.
I was hoping to use original half of standard 2 channel programmer for the water cylinder timing.
Is there a relay available to do this job controlled via existing wiring centre or would I be better finding a separate timer suitable for the 6kw load?
thanks in advance
unvented electric 3kw cylinder to be fitted to property alongside electric water heater for radiators. The water heater has terminals for supply and control wiring, the cylinder does not.
I was hoping to use original half of standard 2 channel programmer for the water cylinder timing.
Is there a relay available to do this job controlled via existing wiring centre or would I be better finding a separate timer suitable for the 6kw load?
thanks in advance