Electric shower fitted on the wrong end of bath. | Page 2 | on ElectriciansForums

Discuss Electric shower fitted on the wrong end of bath. in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

It’s C1, C2, C3 for things actually checked and be coded.

FI for Further Investigation

NV for not verified. Means it’s there, but I couldn’t physically test it / couldn’t be bothered.

NA no applicable. It’s not there to be tested.
 
FWIW, the last electric shower I fitted was to a double-ended bath where the taps were in the middle, so I had a choice of 2 walls to fit the shower to...but in the end, I fitted an instant electric shower to one end and another one, off the combi boiler, to the other end.
I couldn't fit any shower above the taps because there wasn't a wall there, just a window.
 
The numpties haven't fitted the shower in one of the zones have they? Then yes, it's a C2. Everyone knows water and leccy don't mix. Shower should be at least 600mm away from the end of the bath or preferably on the landing.
 
Absolutely not. The cubicle is to keep the water off the electrical equipment. Would you suggest fitting a shower head in a switchroom? I think not. Musical Differential Inflammation or whatever it's called.

BTW I can't believe you gave me a thumbs-down for post 24... you've upped my neg rep by 20% in one hit!
 
Absolutely not. The cubicle is to keep the water off the electrical equipment. Would you suggest fitting a shower head in a switchroom? I think not. Musical Differential Inflammation or whatever it's called.

BTW I can't believe you gave me a thumbs-down for post 24... you've upped my neg rep by 20% in one hit!

I think your reputation will survive this little dent!!
 

Reply to Electric shower fitted on the wrong end of bath. in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
333
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
888
  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
857

Similar threads

I usually put something like this To assess compliance with BS7671 for continued safe operation (5 year periodical inspection)
Replies
8
Views
538
I own a top floor tenement flat that I used to live in and then rented out after I married. It is currently empty whilst some work is being done...
Replies
0
Views
664

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top