NOW THAT THE PIR REPORT HAS BEEN SUPERCEDED BY THE EICR IS THEIR A CERTAIN WAY THESE HAVE TO BE FILLED OUT.
BASICALLY WE USE AMTECH SOFTWARE AND AFTER YOU HAVE FILLED ALL THE NORMAL DETAILS IN IT GIVES YOU THE OPTION TO FILL OUT 3 PAGES FOR THE SCHEDULES OF ITEMS INSPECTED FOR MULTI BOARD USE , WHICH IF YOU HAVE A LARGE INSTALLATION TAKES A VERY LONG TIME TO DO. BUT AS IT GIVES YOU TICK BOX TO EITHER PRINT AND VERIFY WHEN YOU MASTER THE CERT ARE THESE NEEDED OR IS IT A OPTION OF THE CLIENT
ALL REPLYS WELCOME:hurray:
NOW THAT THE PIR REPORT HAS BEEN SUPERCEDED BY THE EICR IS THEIR A CERTAIN WAY THESE HAVE TO BE FILLED OUT.
BASICALLY WE USE AMTECH SOFTWARE AND AFTER YOU HAVE FILLED ALL THE NORMAL DETAILS IN IT GIVES YOU THE OPTION TO FILL OUT 3 PAGES FOR THE SCHEDULES OF ITEMS INSPECTED FOR MULTI BOARD USE , WHICH IF YOU HAVE A LARGE INSTALLATION TAKES A VERY LONG TIME TO DO. BUT AS IT GIVES YOU TICK BOX TO EITHER PRINT AND VERIFY WHEN YOU MASTER THE CERT ARE THESE NEEDED OR IS IT A OPTION OF THE CLIENT