J
Julian Davies
We're looking for up to 3 electricians to wire up our modular Anaerobic Digestion units. What's that? Have a look at our website www.seabenergy.com The work is in our fabricating unit in Romsey, Hampshire, 10 mins off J3 of the M27 or J14 of the M3. Units are brand new and the environment is clean.
Right now we are rushing to get the units out of the door, and are seeking contractors. However, we will be looking to take on somebody to carry out on-site commissioning. (The units you will be working on are going to Paris, New York, and the american mid-west, and I am going with them) If you are looking for something interesting and more permanent, we can discuss that as well.
We do need properly qualified, 17th edition, capable of working independently from drawings. 2391 an advantage but not essential.
Please get in touch if you are likely to be available. Thanks.
Right now we are rushing to get the units out of the door, and are seeking contractors. However, we will be looking to take on somebody to carry out on-site commissioning. (The units you will be working on are going to Paris, New York, and the american mid-west, and I am going with them) If you are looking for something interesting and more permanent, we can discuss that as well.
We do need properly qualified, 17th edition, capable of working independently from drawings. 2391 an advantage but not essential.
Please get in touch if you are likely to be available. Thanks.