Hi guys,
Been asked to fit 2 lights and a switch, which in reality turned out to be rewiring a multiple PIR setup to a single switch, adding multiple other fittings and emergency lighting (all of the lights were selected and at the depot when I got there) they were supplied by the lighting company next door. Em lighting was existing but adding extra fittings.
Obviously a minor works cert. Would suffice for the addition of the light fittings, but no certificate of conformity has been mentioned which I'm sure they're going to need.
Can I just issue the minor works certificate for each circuit, 1x lighting, 1x emergency light fittings and be done with it or do I need to go through with getting the emergency lighting cert sorted?
I'm registered with Napit but they haven't really given me much direction with it.
Thanks
Been asked to fit 2 lights and a switch, which in reality turned out to be rewiring a multiple PIR setup to a single switch, adding multiple other fittings and emergency lighting (all of the lights were selected and at the depot when I got there) they were supplied by the lighting company next door. Em lighting was existing but adding extra fittings.
Obviously a minor works cert. Would suffice for the addition of the light fittings, but no certificate of conformity has been mentioned which I'm sure they're going to need.
Can I just issue the minor works certificate for each circuit, 1x lighting, 1x emergency light fittings and be done with it or do I need to go through with getting the emergency lighting cert sorted?
I'm registered with Napit but they haven't really given me much direction with it.
Thanks