EPC requirement from April 1st | on ElectriciansForums

Discuss EPC requirement from April 1st in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

N

Noshocks

Can the EPC be carried out by the surveyor of the MCS company, assuming they are also a qualified DEA, I am sure I read somewhere that the EPC should be produced by an independant person/entity. If so it would be a waste of time me training for the DEA qualification?

(I also noticed on the 'Solar Power Portal' today that it has been confirmed that installed PV can be counted towards the EPC rating)
 
Last edited by a moderator:

Reply to EPC requirement from April 1st in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Sticky
  • Article
Wicked I've just actually looked through it and it's very smart. Some good stuff in it. There's a tile association company that do a magazine...
Replies
2
Views
274
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
269
  • Article
Hi everyone, Another weekend, another sale! Get ready for colder days with Haverland Radiators, combining efficiency with modern design. Keep...
Replies
0
Views
350

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top