Hi All, have to quote a client on putting together electrics to power a crypto farm he's assembling.
He has 3-phase coming into the property. The incoming supply is housed under the street vault adjacent to the main house basement (see attached image). He plans on putting suitable racks in the vault to support 3 shelves with 5 servers per shelf. Each server is 3kw. In the room he also needs an air flow system (vault is 10 cubic mtrs), power for portable air-con and UPS.
Interested to see what suggestions all of you may have to come off the 3-phase supply in the picture, type of board, RCBO'S for each bank of servers etc. etc.
TIA
He has 3-phase coming into the property. The incoming supply is housed under the street vault adjacent to the main house basement (see attached image). He plans on putting suitable racks in the vault to support 3 shelves with 5 servers per shelf. Each server is 3kw. In the room he also needs an air flow system (vault is 10 cubic mtrs), power for portable air-con and UPS.
Interested to see what suggestions all of you may have to come off the 3-phase supply in the picture, type of board, RCBO'S for each bank of servers etc. etc.
TIA