Just done a periodic, and found the water main bonding is daisy-chained off of the gas main bond.
I seem to remember thats okay as long as the cable is unbroken at the first point of call. ( g/y sleeving stripped back at the earth clamp )
However the cable IS cut and then both ends are crimped and the lugs bolted to the earth clamp.
Looking through the regs I cant find the actual regulation that forbids this... or is it okay but just bad practice??
I seem to remember thats okay as long as the cable is unbroken at the first point of call. ( g/y sleeving stripped back at the earth clamp )
However the cable IS cut and then both ends are crimped and the lugs bolted to the earth clamp.
Looking through the regs I cant find the actual regulation that forbids this... or is it okay but just bad practice??