O
OtleySpark
I have a copy of the IEE Electrician's Guide to the Building Regulations Part P, 2nd Edition.
I'm reading through it before I start my OLCI basic electrical workshop next week.
The text on page 87 describes 3 steps in testing for Continuity of ring final circuits. On page 88 are diagrams for each test.
It looks like the diagrams labelled Figure 6.3.5b and 6.3.5c are mixed up and should be swapped - they refer to step 2 & 3 consecutively.
Can anyone confirm this or put me out of my misery and explain why the diagrams are right?
Thanks
I'm reading through it before I start my OLCI basic electrical workshop next week.
The text on page 87 describes 3 steps in testing for Continuity of ring final circuits. On page 88 are diagrams for each test.
It looks like the diagrams labelled Figure 6.3.5b and 6.3.5c are mixed up and should be swapped - they refer to step 2 & 3 consecutively.
Can anyone confirm this or put me out of my misery and explain why the diagrams are right?
Thanks