S
solgen
Hi,
I know this topic has been discussed before, but ...
Is it a requirement to install an export meter for systems over 30kW? The building to which the system is attached will consume at least 90% of the energy so it may not be worth the extra cost of export metering compared to a small 10% revenue for exporting.
Thank you
I know this topic has been discussed before, but ...
Is it a requirement to install an export meter for systems over 30kW? The building to which the system is attached will consume at least 90% of the energy so it may not be worth the extra cost of export metering compared to a small 10% revenue for exporting.
Thank you