Had a job last evening/night, strip out and replace all lights in conduit and singles in a commercial unit.
Had all the conduit and fittings up by 10pm, some awkward places but neat job and feeling pleased with myself.
Went to my vehecle to get the cable, and realised that in my rush between the last job and preparing for this one I had picked up my drums of 2.5 rather then 1.5.
I had a choice of a 2 hour round trip back home or fitting a lighting circuit with room for lots of further expansion.
Idiot.
Anyone else want to own up to stupid blunders?
Had all the conduit and fittings up by 10pm, some awkward places but neat job and feeling pleased with myself.
Went to my vehecle to get the cable, and realised that in my rush between the last job and preparing for this one I had picked up my drums of 2.5 rather then 1.5.
I had a choice of a 2 hour round trip back home or fitting a lighting circuit with room for lots of further expansion.
Idiot.
Anyone else want to own up to stupid blunders?