I've never filled in an Electrical Installation Certificate before and just need to query something. The circuit to be tested is a supply for a 3Ph machine. The machine is supplied from a DB which is fed from a Section Board which in turn is fed from a Main Section Board.Section Main Switch / Switch Fuse / Circuit Breaker / RCD - Is that details from Main Switch on Main Section Board, Section Board or DB.My Ze and Pfc readings to be taken from the Main Section Board ?