0
067256
Hi there,
Done a fuseboard change today, but getting a bit confused with the Ze and Zs tests
Where are these tests done? At the DB main tails incomer, at the origin (sweated earth on incoming cable)
It is a TN-S supply and i have a 3 lead L-N-E megger loop tester.
Getting a bit confused aswell with what bonding is disconnected too.
Any help would be appreciated. Thanks.
Done a fuseboard change today, but getting a bit confused with the Ze and Zs tests
Where are these tests done? At the DB main tails incomer, at the origin (sweated earth on incoming cable)
It is a TN-S supply and i have a 3 lead L-N-E megger loop tester.
Getting a bit confused aswell with what bonding is disconnected too.
Any help would be appreciated. Thanks.