Hi
I just need to get this clear in my head.....
1) Customer has 4kW system installed.....getting 43.3p (or whatever rate is now). Feed goes to domestic MPAN.
2) Customer wants another 10kW system installed on same 'site'.....by OfGem's definition. Different MPAN. EPC not required as second system is not to a building that requires 'conditioning'.
Q1) What FIT rate will he get? His initial system will presumably stay at 43.3p. Will he get FIT for second system at 4-10kW (16.8p), or > 10kW (i.e. 14kW)?
Thanks for advice. I don't want to mis-quote customer.
/Newb
p.s. Just to keep this on-subject, no need to discuss G83/G59 etc. That part is all clear.
I just need to get this clear in my head.....
1) Customer has 4kW system installed.....getting 43.3p (or whatever rate is now). Feed goes to domestic MPAN.
2) Customer wants another 10kW system installed on same 'site'.....by OfGem's definition. Different MPAN. EPC not required as second system is not to a building that requires 'conditioning'.
Q1) What FIT rate will he get? His initial system will presumably stay at 43.3p. Will he get FIT for second system at 4-10kW (16.8p), or > 10kW (i.e. 14kW)?
Thanks for advice. I don't want to mis-quote customer.
/Newb
p.s. Just to keep this on-subject, no need to discuss G83/G59 etc. That part is all clear.