Anyone else
1)done the calcs
2)spec'ed the mounting frame
3)got the loading
4)paid for the surveyor to purse his lips and say yes.
5)client got planning permission sorted.
now....
6)can't get the kit thats was spec'ed, cause they are too busy with on roof to even listen to flat roof mounting kits.
After all that shell out and agro... i'm forced into a corner.. either change the kit, but i probably won't get any, and would need to get weightings etc done again... . Cancel and leave a hole of £500, and look like a muppet..
I've got four of these...
1)done the calcs
2)spec'ed the mounting frame
3)got the loading
4)paid for the surveyor to purse his lips and say yes.
5)client got planning permission sorted.
now....
6)can't get the kit thats was spec'ed, cause they are too busy with on roof to even listen to flat roof mounting kits.
After all that shell out and agro... i'm forced into a corner.. either change the kit, but i probably won't get any, and would need to get weightings etc done again... . Cancel and leave a hole of £500, and look like a muppet..
I've got four of these...