Last job of the day 8 O'Clock tonight. Replace immersion element. Shut off water main, remove old element, water everywhere!!! Turns out that the stop cock does not shut off the fu***ng water. Hall soaked, I'm soaked. Just hope the wooden flooring am doesn't start to warp when it dries out. Dried off, cold beer and Chinese on the way!!!