S

sparc

I have to link make a temporary supply to a building that's going to get demolished shortly. Coming into the meter cupboard on 3 core 6.0mm2 SWA I need to hook up to the existing 25mm2 meter tails, so existing meter and REC switch can be disconnected and be removed by SSE.

There's not a lot of space, so ideally I want a single box. Can't find anything that will do it in one box, so plan to terminate SWA in one housing, then take the L and N from 6mm T&E to a 100A main switch in a second enclosure, with the tails to consumer unit coming from that. The earths can go to an existing MET, which is currently earthed via spike. (The new supply is PME).

Could find anything already posted on this, so wondering if anyone has any suggestions please.
 
This is a new one on me - must have been away the day they covered that :-( I've just searched BGB for 'eddy currents' but not found anything so far- can you direct me to appropriate bits please?

You won't find it in the BGB. Eddy currents cause a magnetic flux around a hole in ferus material that has a single conductor through it. If you have 20 amps flowing through the conductor you will have the equivalent of 20A flowing around it, all be it a very low power as it's a dead short.
They only really become a problem when you have say 500A coming from a transformer. By cutting a slot between the holes the magnetic path is broken.



View attachment 14616
 
Last edited by a moderator:
Sorry thaught you would be taking the supply straight from the swa not using the tails. Where is the feed coming from?

Opening myself up for more drubbing here :) but here's the other end of that SWA. As the house is getting demolished a temporary new supply and meter was installed in garage. This is to supply the house (via SWA) for a week, then the SWA will get moved to supply the mobile home while new house is being built. The second CU is to supply power for site. So straight away you'll see I've done same thing with tails going into CU on right via separate holes. Won't be doing that again in a hurry! Bit on left is temporary waiting on builders to say what they want. All this will get torn down when new house completed in a few months time.
 

Attachments

  • [ElectriciansForums.net] From SWA to meter tails
    DSCN1455.jpg
    204.2 KB · Views: 70

Reply to From SWA to meter tails in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
378
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
952
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
Thanks for the replies, I appreciate it.
Replies
4
Views
697
  • Question
Yeh that’s my thinking. I have to supply the box so can order a bigger 3 phase option to give myself a bit more room
Replies
3
Views
857

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top