Hi everyone, I had a call today about a board I changed lasted year with a 100amp main switch and individual RCBO'S. At the time I did this work it was my intention to leave one spare way for future expansion, which was fine until I found that the up and down ring circuits both had spurs in them so I used the spare ways for them, baring in mind that this is a 1930' s detached house with all the extensions, conservatory etc already added.
Any way another electrician was carrying out some work for the client and pointed out that the last electrician had not left any room for future expansion. Not the the sparks needed the extra way, he just felt like telling the client that.
Anyway with that the client called my saying that I had carried out a substandard installation, and expected a written response from me. What do you think I should say. I am currently looking through the reg's as I do vaguely remember seeing this mentioned. Can any of you out there recall the reg' no.
Cheers Steve
Any way another electrician was carrying out some work for the client and pointed out that the last electrician had not left any room for future expansion. Not the the sparks needed the extra way, he just felt like telling the client that.
Anyway with that the client called my saying that I had carried out a substandard installation, and expected a written response from me. What do you think I should say. I am currently looking through the reg's as I do vaguely remember seeing this mentioned. Can any of you out there recall the reg' no.