pete433
Hi
We are a small installer undertaking 1 install a week, all are work so far is domestic under 4KW. We now have 3 larger installs that fall under G59, can anyone shed some light on the procedure for G59. Also how do we undertake the metering etc.
One of the installs allready has 1 x 3.7KW on one phase we are upping this to 10KW using the other two phases, so G83 on three phases would we remove the existing meter and re-install a three phase meter.