I have been ask to look at supply a shed/summer house with a supply for a s/outlet and a light. Due to the small load I was going to spur from a socket, swa to shed then a little 2 way cu. this is because the run from the d/b is complicated and involves a lot of remedial work that the customer does not want. My query is what about earthing for the shed. The house is on a tt system, do I have to provide a earth spike or can I export from the met. I am a little worried about my ze reading not being low enough. Also I am a little bit concerns about no discrimination between the shed and house d/b
Many thanks
Many thanks