magill

After a bit of advice please. I need to earth the gas supply. The only query i have though is that a pipe branches off to supply the gas hob, prior to entering the building.
Do i need to connect the earth prior to this branch on the outside or is it ok to connect as the main supply pipe enters the building, which is after the branch?
 
Last edited by a moderator:
Thanks for quick response. The branch "T" joint is approx two metres away from where the main supply enters the building, so running the earth cable through the wall down to it then clamping on the other side of the T join is the way to do it i take it?
 
Magil,

I think you need to seek professional help, Earthing to services is a serious task and for the sake of safety requires the job to be done correctly. if you are not sure of the requirements then leave well alone. The safety of you family and yourself could depend on it.
 
I fully understand concern. I completed the Domestic Installers course, but there are certain elements they do not go into great detail which is where i find myself at present. I am confident enough with the connections at the MET and the safety involved. I did cover bonding in great detail but the part where i have an external branch was never covered. It was a case of within 600mm of entering the building and before any branches. So it was more confirmation i was after really.
Magil,

I think you need to seek professional help, Earthing to services is a serious task and for the sake of safety requires the job to be done correctly. if you are not sure of the requirements then leave well alone. The safety of you family and yourself could depend on it.
 
Again what Malcolm said. You have to bond as close as possible to the entry of the pipe into the building before any branch work. The fact it has branched before it enters the building is not your fault.
The wording of reg 544.1.2 is premises be what you make of that but IMO if you can get to before the branchwork this should be done.
However at the end of the reg it does state point of entry into building for external meter.
IMO (and I'm happy to be corrected) I would do it as close to the entry point as possible and fill out a letter detailing the deviation from the reg.
 
I think this is right, but fully expect to be corrected.
Test the resistance between where you bond at the point of entry and before the branch, if you get a reading of less than 0.05 ohms then you can assume that the point you should have bonded at is effectively bonded. Fill out a minor works cert and record the altered point of bonding as a departure from BS7671, job done IMO.
 
Hi mate
Back again. Value your opinion. I have found time to test resistance and gained a reading of 0 ohms. I remember having the same reading on my test board and was told it was because it was such a short distance. I know the book says 0.05 or less, so is 0 ohms ok? (Cable run is approx 15 metres).
 
As close to the stopcock as possible in my eyes, and on the consumers side, main reason for the bonding is that the new supply pipes are now run in blue plastic pipe or yellow for the gas, the old pipes used to be a ferrous metal and gave a good ground to earth, so was never a problem. For those that are unsure why we do it.
 
Hi
I used a wander lead and nulled all. Disconnected the cable from MET and placed one probe on end. Placed other probe on pipe as it entered building. Cant think of anything i am doing wrong, so it could possibly be the meter!
 
I wouldn't worry about your meter the resistance is probablly so low that most meters won't read it.
You could try not nulling the meter and then subtract the figure for the wander lead from the figure for the pipe and wander lead.
Might actually give you a figure to play with, whether it would be accurate though is anybodies guess.
 

Reply to Gas supply earth connection in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
764
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
1K
  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
976

Similar threads

S
  • Article
Capping off redundant pipework question. Hi all. I done some work for someone a few years ago and I've been getting paranoid that things haven't...
Replies
0
Views
205
sammy67
S
S
  • Article
Capped gas pipe begging oven Hi all. Hope you are well. So I fitted a new induction hob today for my father and whilst the old hob was off I saw...
Replies
0
Views
189
Steveuk
S

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top