Hello Gents.
Long time.
We have a 250A 3 Phase 415V. PEN Genny to install.
I thought I'd pop in here whilst I look elsewhere as well:
Just wondering what sort of Earth rod situation I should have going on, what length and all that jazz, including the resistance I need.
I could do it my way but I'd for sure be breaking someone's precious regulation somewhere I bet.
First I've done and I bet there's some people here who can blow me out the water so please do so.
Edit: Little bit more on it - Industrial Continuous Generator, not standby, not connected to DNO or mains at all.
Cheers Lads.
Long time.
We have a 250A 3 Phase 415V. PEN Genny to install.
I thought I'd pop in here whilst I look elsewhere as well:
Just wondering what sort of Earth rod situation I should have going on, what length and all that jazz, including the resistance I need.
I could do it my way but I'd for sure be breaking someone's precious regulation somewhere I bet.
First I've done and I bet there's some people here who can blow me out the water so please do so.
Edit: Little bit more on it - Industrial Continuous Generator, not standby, not connected to DNO or mains at all.
Cheers Lads.