Hi All
Only just signed up so go easy on me, ill introduce myself in the newbies sections soon.
I have finished my 3 year at college (C+G's 2330) late may and a family member has asked me to run power to a granny annex/log cabin thats situated about 90 ft down the end of their garden for his mother-in-law. and has also asked me to add sockets inside as well as lighting (about 4 light fixings in all)
From theories/regs etc i have learnt from college...
I had a look at what is needed to be to done, the area etc. His CCU is situated above his stairs and is beside a main wall. so, do i run the correct thickness SWA ( after calculating voltage drop etc) from the side of the CCU out the wall, down to floor level, then either bury it or clip it to the concrete panels along the bottom of the fence via saddles to the bottom of the garden to the cabin?...
Then from there into a small garage type mini CCU with 2 rcds/mcbs for sockets and for lights?
Also, how much would you charge?
Would this be the correct way to do this or is there a better way? As this is a farly big job for me and i want to do it properly for them to get signed off.
Many thanks.
Adam
Only just signed up so go easy on me, ill introduce myself in the newbies sections soon.
I have finished my 3 year at college (C+G's 2330) late may and a family member has asked me to run power to a granny annex/log cabin thats situated about 90 ft down the end of their garden for his mother-in-law. and has also asked me to add sockets inside as well as lighting (about 4 light fixings in all)
From theories/regs etc i have learnt from college...
I had a look at what is needed to be to done, the area etc. His CCU is situated above his stairs and is beside a main wall. so, do i run the correct thickness SWA ( after calculating voltage drop etc) from the side of the CCU out the wall, down to floor level, then either bury it or clip it to the concrete panels along the bottom of the fence via saddles to the bottom of the garden to the cabin?...
Then from there into a small garage type mini CCU with 2 rcds/mcbs for sockets and for lights?
Also, how much would you charge?
Would this be the correct way to do this or is there a better way? As this is a farly big job for me and i want to do it properly for them to get signed off.
Many thanks.
Adam